Facade Semily

Semily Finished 2026 994m2 A façade for a company building in Semily was installed using Vračan limestone, fixed with stainless steel stone anchors. This solution ensures high strength, long-term durability, and resistance to weather conditions, while delivering a clean and elegant natural look with an emphasis on precise workmanship.

Facade Přerov

Přerov Finished 2026 600m2 A sandstone façade was installed using stainless steel stone anchors. This anchoring system ensures high strength, long-term durability, and resistance to weather conditions. The result is a solution that is not only functional but also visually distinctive, with a strong emphasis on detail and quality craftsmanship.  

Funeral hall

Přerov Finished 2025 400m2 Renovation of an original uneven and worn stone floor including: replacement of broken and damaged stone tiles local repairs and completion of missing sections grinding of surface irregularities and levelling of the floor smoothing and polishing to a soft semi-gloss finish final conservation of the stone using protective impregnation to enhance […]

House on James’ square

Brno Finished 2024 100m2 Installation of stone tiles and paving on James’ square in Brno. Material Crema marfil and Magma gold.

House on Leitnerova street

Brno Finished 2024 100m2 Installation of stone tiles and paving on Leitnerova street in Brno. Material Emperador dark polished surface and Crema marfil brushed surface.

Residence Sadová

Zlin Finished  2021 120m2 Complete supply and installation of a facade ventilated system on stone anchors at the Rezidence Sadová Zlín apartment building, including insulation with vapor barrier and anti-graffiti coating. Material Travertino Classico.  

Myslivna restaurant

Zlin Finished 2024 200m2 Complete reconstruction of the restaurant Myslivna Zlín. Material Kraličák marble (Králický Sněžník) 1939 and Vračan Marble was covered with a carpet Joints cut out and stitched with polyester The wooden parquet floors of 1939 were also completely renovated

Tiles hall Jičín

Jičín Finished 2024 350m2 Refurbishment of old structural concrete in an industrial hall used for years. Converted into a showroom. The result is investment savings for further surface treatment. In addition, it can be permanently polished and is resistant to oils when using chemicals.

River City

Prague Finished in 2022 2500 m2 Installation of ceramic facade Agrob Buchtal material on a steel substructure of our own production. Fastening with the Agrob